Client / Pure Construction
Scaffold Type / Hanging/cantilevered
Tags /

What you don’t see in this photo is that this “floating scaffold” was 40m in the air. We had to span a 12m distance, build a 6m high scaffold on it and not attach it to the building. “Yeah right!” This is a situation where your trust in the system is seriously challenged. The guys did a great job. No hiccups, no drama!