Client / Lanta
Scaffold Type / High rise scaffold with temporary roof
Tags /

The specs of this job demanded that we have a scaffold that only covered half of the building’s roof, therefore creating a potentially weak structure. With some engineers specs, we managed to tie the scaffold structure to the existing building without interfering with the scope of works. During the course of the job we encountered 3 of the worst storms Auckland has had in any summer. Unfortunately, we lost the entire wrap during one of those storms, however the scaffold stood firm, though it wasn’t without some loss of sleep.